Background:
In June 2010, the City purchased the four miles of former BNSF Railroad right-of-way in Redmond and immediately began planning for the development of the corridor for city and regional projects such as a stormwater trunk line, a regional trail and linear park, northsouth transportation connections, and future light rail.In June 2011, the City adopted the Redmond Central Connector Master Plan for the corridor, which identified a phased approach to building the regional trail and linear park.
Project Description:
Redmond Central Connector project, Phase II provides a paved multiuse trail connection from the end of Phase I at the Sammamish River Trail to the 9900 block of Willows Road. The route of the new trail construction primarily follows the BNSF railroad corridor (see Attachment A). The project construction includes: • Installation of more than 1.3 miles of a paved trail. • Redevelopment of two existing rail bridges for pedestrian use. • Development of adjacent pedestrian features for park use. • Complete pavement, curb, gutter and sidewalk at NE 90th Street, NE 95th Street and private driveways along the corridor in support of the new trail crossings.