Click on a link below to jump to updates for other projects funded by the 2016 bond:
|
|
Timberline Middle School |
- The gymnasium floor is complete.
- Kitchen equipment is installed.
- Painting and flooring are nearly complete.
- Shelves are being installed in the library.
- Landscaping has begun.
|
|
|
|
|
|
Peter Kirk Elementary School |
- Building weatherproofing (orange in photo) is complete.
- Staff had their first chance to tour the new building in February.
- Framing is complete.
- Drywall installation has begun.
|
|
|
|
Old Redmond Schoolhouse |
- Demolition is complete. The left and right photos show the original brick and wood framing that were visible after demolition.
- Classroom framing is in progress. The center photo shows a future preschool pod with the restroom in the middle of two classrooms.
- Electrical and mechanical installation have begun.
|
|
|
|
|
| Ella Baker Elementary School
This new school opened in fall 2018 with space for 690 students. The student-centered design incorporates features that conserve natural resources and reduce energy costs. The school is named after Ella Baker, a Civil Rights leader, and focuses on empowering students to be changemakers.
|
|
|
|
| Clara Barton Elementary School
The new school opened in fall 2018 with space for 690 students. The student-centered design incorporates features that conserve natural resources and reduce energy costs. The school is named after Clara Barton, who was a teacher before she founded the American Red Cross.
|
|
|
|
| Explorer Community School
The school opened in fall 2017. Four innovative and energy-efficient modular classroom buildings replaced aging portable classrooms.
|
|
|
|
Have a question about a bond project? Let's Talk! Have a question about any of these projects? Ask us through our "Let's Talk" system. This system allows you to share comments or ask questions to members of our team. |
|